This job consisted of an extension to the existing storage facility for the Halton Waste Management Site.  It consisted of a 5000 sq.ft extension to their existing warehouse which they have outgrown, insulation and drywall for the existing warehouse, and the build of a parking lot and fence around the perimeter of the storage facility.  

Also included was an application of a SIKA floor epoxy for the concrete floor and aluminum siding for the new addition.